Installing Battery Cabinets
3-24
EATON
Powerware
®
9390 Integrated Battery Cabinet (Models IBC-S and IBC-L) Installation Manual
S
164201536 Rev D
www.eaton.com/powerquality
3.5 Completing the Installation Checklist
The final step in installing your battery cabinet is to complete the Installation Checklist.
This checklist ensures that you have installed all hardware, cables, and other equipment.
Completing all items on the checklist will ensure a smooth installation. Make a copy of the
Installation Checklist before filling it out, and retain the original.
After completing your installation, a service representative will be able to verify the
operation of your battery cabinet, and commission it to support your critical load. The
service representative cannot perform any installation tasks other than verifying that the
battery cabinet has been correctly installed. Service personnel may request a copy of the
completed Installation Checklist to be sure you have completed all applicable equipment
installation requirements.
NOTE
The Installation Checklist MUST be completed prior to starting the UPS system
for the first time.
Installation Checklist
-
All packing materials and restraints have been removed from each cabinet.
-
Each cabinet in the battery system is placed in its correct location.
-
All cabinets are bolted together.
-
A ground wire is installed between all cabinets that are bolted together.
-
All conduits and cables are properly routed to the battery cabinets.
-
A ground conductor is properly installed.
-
Battery cables and harness are terminated on the E4 and E5 terminals in the UPS cabinet.
-
Internal battery cabinet connections have been completed (cables, plugs, etc.).
-
The EMP is installed and setup by an authorized Powerware Customer Service Engineer.
-
Air conditioning equipment is installed and operating correctly.
-
The area around the installed battery system is clean and dust‐free. (It is recommended that the battery
cabinet be installed on a sealed concrete pad or a sealed concrete floor.)
-
Adequate working area exists around the battery cabinet and other cabinets.
-
Adequate lighting is provided around all battery cabinet equipment.
-
A remote battery disconnect control is mounted in its installed location and its wiring is terminated inside
the battery cabinet (OPTIONAL).