IQ 250/260 Transducer
www.eaton.com
IB02601005E
Q-1
DIN Rail Installation
IQ 250/260 Transducer Quick Start Guide
Mechanical Installation
Q
Installation Steps
Slide top of groove of
meter onto DIN Rail.
Press gently until the
meter clicks into place.
If mounting with DIN
Rail provided, use Black
Rubber Stoppers (also
provided) shown below.
To remove meter, pull
down on Release Clip.
Electrical Wiring Diagrams
IQ 250/250T Dimensions
WYE Direct 3 Phase, 4-wire
WYE with PTs 3 Phase, 4-wire
DELTA Direct 3 Phase, 3-wire
DELTA with PTs 3 Phase, 3-wire
Select a diagram to meet your
application.
NOTE: Other wiring
configurations are available.
See the IQ 250/260 User and
Installation Manual, on the
enclosed CD.
Release Clip
HIGH Side
LOW Side