background image

                                                                                                

IQ 250/260 Transducer    

            

                                                      

www.eaton.com

                    IB02601005E

         

         Q-1 

 

DIN Rail Installation  

IQ 250/260 Transducer Quick Start Guide

 

Mechanical Installation 

 

 

 

 

 

 

 

 

 

 

Q

  

Installation Steps

 

Slide top of groove of  
meter onto DIN Rail. 
Press gently until the  
meter clicks into place. 
 
If mounting with DIN 
Rail provided, use Black  
Rubber Stoppers (also  
provided) shown below.   

 

 

 

 

 

To remove meter, pull  
down on Release Clip.

 

 

Electrical Wiring Diagrams

 

                                

 

 

 

 

 

 

 

 

 

                     IQ 250/250T Dimensions 

WYE Direct 3 Phase, 4-wire 

          WYE with PTs 3 Phase, 4-wire 

DELTA Direct 3 Phase, 3-wire 

DELTA with PTs 3 Phase, 3-wire 

Select a diagram to meet your 
application. 

NOTE: Other wiring 
configurations are available. 
See the IQ 250/260 User and 
Installation Manual
, on the 

enclosed CD. 

Release Clip 

HIGH Side 

LOW Side 

Reviews: