Instructional Booklet 

IB02601010E

Effective October 2013

IQ35M-ENC enclosure

installation guide

 

eaton 

www.eaton.com

Step 2. Mount the IQ35M-ENC enclosure to a wall or a panel

Cut holes in the enclosure for wire conduit connections prior to the 

installation of the meter in the enclosure. After running the wiring, 

seal all holes properly to maintain the enclosure rating. If using 

metallic conduit, bonding between the conduit connections is not 

automatic and must be provided as a part of the installation.
Take care to protect the equipment from drill chips, filings, and other 

contaminants when making the wire entry holes and mounting the 

enclosure to prevent component damage or a future malfunction.
Use the included mounting hardware to attach the mounting feet 

to the enclosure. Then mount the enclosure to the wall or the 

panel using either a 4-point or 2-point configuration (hardware for 

mounting to the wall/panel is provided by the installer). The 4-point 

configuration is shown below. For a 2-point configuration, mount the 

feet as shown, but rotate the bottom feet 180 degrees so that they 

are flush against the back of the enclosure.

Step 3. Install IQ 35M Series meter onto DIN rail  

inside the IQ35M-ENC

Run meter wiring through the holes drilled previously. Wire the 

meter according to the instructions in the meter installation guide.
Push the top of the meter onto the DIN rail.

Push the bottom of the meter onto the DIN rail until there is an 

audible click.

Lower the four brackets so that the swing panel cover can be 

attached using the enclosed hardware.