15
10/09 AWB1230-1605
Effective October 2009
Operation and maintenance of
IZM low voltage air circuit breakers
MOELLER
www.moeller.net/de/support
Figure 13. Typical Fixed IZM Circuit Breaker
Mounting Foot
nOTiCE
rEFEr TO THE CirCUiT BrEakEr WEigHTS in
TO EnSUrE THaT
THE PanEL On WHiCH a FiXED CirCUiT BrEakEr iS TO BE MOUnTED iS
CaPaBLE OF SUPPOrTing THE WEigHT.
Circuit breaker operation
Circuit breakers should be operated manually and/or electrically
before they are put into service. This can be done during the
installation process or some later date prior to startup. To check
circuit breaker operation, follow the operational procedures outlined
in Section 3 for both manually operated and electrically operated
circuit breakers.