33
10/09 AWB1230-1605
Effective October 2009
Operation and maintenance of
IZM low voltage air circuit breakers
MOELLER
www.moeller.net/de/support
Figure 42. Connection Diagram for IZM99 and IZM63 Frame with Digitrip 1150 with AABBCC Configuration (Type P Trip Unit)
Notes 1.
On
three-pole
breakers
only
(not
eight
physical
poles),
having
ground
fault
functionality
, a
jumper
installed
from
B-6
to
B-7
will
enable
source
ground
fault
sensing
and
disable
residual
ground
fault
sensing.
Inputs
B-4
and
B-5
will
be
reassigned
for
source
ground
sensor
inputs.
2.
All
auxiliary
switches
shown
with
breaker
in
OPEN
position
and
with
spring
not
charged,
and
with
trip
unit
in
“non-tripped”
state
(OTS
switches).
3.
T
he
s
pr
in
g
re
le
as
e
ac
ce
ss
or
y
co
ns
is
ts
o
f
an
“
S
R
”
co
il
an
d
a
P.
C
. b
oa
rd
. T
he
p
rin
te
d
ci
rc
ui
t
bo
ar
d
pr
ov
id
es
a
0
.2
0-
se
co
nd
p
ul
se
fo
r
th
e
cl
os
in
g
op
er
at
io
n.
V
ol
ta
ge
m
us
t
be
r
em
ov
ed
a
nd
t
he
n
re
ap
pl
ie
d
fo
r
su
bs
eq
ue
nt
o
pe
ra
tio
n.
A
n
op
tio
na
l l
at
ch
c
he
ck
s
w
itc
h
(L
C
S
) a
cc
es
so
ry
m
ay
b
e
co
nn
ec
te
d
to
t
he
s
pr
in
g
re
le
as
e.
T
he
(c
lo
se
d)
L
C
S
d
el
ay
s
th
e
sp
rin
g
re
le
as
e
pu
ls
e
un
til
t
he
b
re
ak
er
m
ec
ha
ni
sm
is
r
ea
dy
t
o
cl
os
e
(c
ha
rg
ed
a
nd
r
es
et
).
(T
hi
s
w
ill
e
ns
ur
e
th
at
t
he
la
tc
h
w
ill
a
lw
ay
s
be
in
t
he
p
ro
pe
r
st
at
e
be
fo
re
t
he
sp
rin
g
re
le
as
e
pu
ls
e
is
in
iti
at
ed
.)
If
vo
lta
ge
is
m
ai
nt
ai
ne
d
to
t
he
s
pr
in
g
re
le
as
e,
t
he
c
lo
si
ng
p
ul
se
w
ill
o
cc
ur
w
he
n
th
e
m
ec
ha
ni
sm
is
c
ha
rg
ed
a
nd
r
es
et
(L
C
S
o
pe
n)
. V
ol
ta
ge
m
us
t
be
r
em
ov
ed
a
nd
r
ea
pp
lie
d
to
t
he
s
pr
in
g
re
le
as
e
fo
r
su
bs
eq
ue
nt
o
pe
ra
tio
n.
4.
To
provide
selected
time
delays
for
short
time
and/or
ground
time
functions
for
testing
or
non-zone
interlocking
applications,
a
jumper
from
B-8
to
B-9
is
required.
5.
Three-wire
crimp
if
high-instantaneous
trip
module
is
supplied.
6.
Normally
opened
contact
programmed
as
relay
A
via
Digitrip
front
panel
(alarm
contact).
7.
Normally
closed
contact
programmed
as
relay
B
via
Digitrip
front
panel
(block
close
contact).
8.
Normally
open
contact
programmed
as
relay
C
via
Digitrip
front
panel
(latching
contact).
9.
On
four
-pole
breakers
(actually
eight
physical
poles),
the
neutral
current
sensor
is
the
same
style
and
wired
the
same
as
the
phase
sensors,
and
is
located
within
the
breaker
frame.
The
secondary
contacts
B
-4,
B
-5,
are
not
wired
out.
10.
Motor
operator
switch
shown
with
breaker
closing
spring
discharged.
11.
Four
-point
socket
used
here.
12.
Second
shunt
trip
may
be
installed
(using
A
-7,
A
-8
contacts)
in
place
of
UVR
. Third
auxiliary
switch
not
available
with
second
shunt
trip.
13.
Only
one
latch
check
switch
may
be
installed.
Use
of
customer
-accessible
latch
check
switch
(B
-29,
B
-30)
in
series
with
spring
release
defeats
anti-pump
function
and
is
not
recommended.
See
Note
3
for
spring
release
latch
check
switch.
+
SR+
SR–