Instructions for installation, operation,  

and maintenance of Magnum MR2  

(integral racking) 

EATON

 www.eaton.com

Control options

There are three modes of operations available to interface with the 

integrated racking controller:

1. 

Handheld pendant (see Figure 18);

2. 

Discrete I/O;

3. 

Modbus communication .

Option 1

The handheld pendant can operate the integral racking device using 

up to 30 ft . (9 .14 m) of Cat 5 /6 cable (installers may mount a RJ-45 

jack on the front panel of the switchgear - see Figure 19) .  The 

Magnum breaker can be racked to the connect, test, or disconnect 

positions by pressing the desired button while depressing the enable 

button on the pendant .  Magnum breaker position and error codes 

are indicated on the pendant .  

With the pendant plugged in, 

discrete I/O and Modbus control are disabled.

  This is a feature 

that does not allow someone to operate the system remotely while 

an operator is in close proximity of the switchgear .

Figure 18. Handheld pendant.

Option 2

Discrete I/O control allows the user to operate the integral racking 

device via pushbuttons or PLC .  These systems can be wired to a 

central control room or to a remote panel located a safe distance 

away from the switchgear equipment .  If an error occurs while under 

I/O control, all I/O breaker position indication lights will flash .  The 

pendant can then be plugged into a RJ-45 jack located on the front 

panel of the switchgear (if included - see Figure 19) to read the error 

code .  Once the pendant is plugged in, I/O control is disabled until 

the pendant is unplugged .

Table 2.  Indication and control requirements

Indicating LEDs

Open/close interposing relays

Pushbuttons

24 Vdc, 20 mA

120 Vac coil

24 Vdc, 5 mA

Option 3

Modbus communication control allows the user to operate the 

integral racking device via a SCADA system or multiple Modbus 

interface communication systems .  These systems can be wired to 

a central control room or to a remote panel located a safe distance 

away from the equipment .  Error codes can be read with the 

Modbus communication system .  This would be a feature of the 

assembly as a whole, not an individual breaker (for Modbus Interface 

details, refer to “1C19667 Modbus interface  .txt”) .

Figure 19. RJ-45 pendant jack.

Sequence of operations

Below is the basic sequence of operations to use the integrated 

racking system .  The operation steps are the same for each of the 

control options (Pendant, I/O, and Modbus) .

The “Enable” button must be held to operate the pendant .

1. 

Insert the breaker into the breaker cell .

a. 

The breaker is now in the disconnect position .

b. 

The solid green disconnect LED will be illuminated .

c. 

To proceed further and rack the breaker to the connected 

position, the breaker must be open .  If the breaker is 

closed, you will see an E5 code .  Refer to the Diagnostics/

troubleshooting section for more details .

1. 

It is recommended to close the door but not mandatory if 

door safety switch is not included .

2. 

Press the “Test” button while depressing the “Enable” button .

a. 

The buttons can be released after the operation is selected .

b. 

The breaker will then move to the test position .

3. 

The green disconnect LED will turn off and the yellow test LED 

will be illuminated .

a. 

The secondary plugs will mate and the breaker will now have 

control power .

b. 

At this time the breaker open and close operations can be 

electrically tested .

c. 

To proceed further and rack the breaker to the connected 

position, the breaker must be open .  If the breaker is closed 

you will see an E5 code .  Refer to the error code section for 

more details .

1. 

It is recommended to close the door but not mandatory if 

door safety switch is not included . 

4. 

Press the “Connect” button while depressing the “Enable” 

button

a. 

The buttons can be released after the operation is selected .

5. 

The yellow test LED will turn off and the intermediate LED will 

flash as the breaker is in motion .

6. 

Once the breaker reaches the connect position, the solid red 

connect LED will illuminate .

a. 

The breaker is now in the connect position and can  

be energized .

7. 

To rack the breaker out, the breaker must be open .  If the 

breaker is closed you will see an E5 code .  Refer to the error 

code section for more details .

8. 

Press the “Connect” or “Test” button while depressing the 

“Enable” button to rack the breaker to the connect or test 

position (respectively) .

a. 

The buttons can be released after the operation is selected .

9. 

The red connect LED will turn off and the intermediate LED will 

flash as the breaker is in motion .

10. 

Once the breaker reaches the test or disconnect position,  

the solid yellow test LED or a solid green disconnect LED  

will illuminate .

a. 

If the breaker is in the test position, there is still control 

power on the breaker and the open and close operations can 

be electrically tested .

b. 

If the breaker is at the disconnect position, the secondary 

plugs will be disconnected and there will not be any 

power on the breaker .  The eight tertiary points will still be 

connected to allow further MR2 racking operations .

Summary of Contents for Magnum MR2

Page 1: ...ndication 5 Setting the breaker type 6 Setting the Modbus address 6 Control options 7 Option 1 7 Option 2 7 Option 3 7 Sequence of operations 7 Diagnostics troubleshooting 8 E1 Motor overcurrent 8 E2 Open motor circuit 8 E3 Motor timed out 8 E4 Magnum breaker position unknown 8 E5 Open permissive 8 E6 Communication error 8 E8 Position switch error 8 Controller diagnostic display 9 Controller mount...

Page 2: ...NNEL WITH THIS TYPE OF PRESENTATION THIS WILL HELP ASSURE THAT PERSONNEL ARE ALERT TO THESE TYPES OF MESSAGES IN ADDITION THESE MESSAGES ARE ALL UPPERCASE AND BOLDFACE All possible contingencies which may arise during installation operation or maintenance and all details and variations of this equipment are not encompassed by these instructions If further information is desired by the purchaser re...

Page 3: ...trol the system by means of a pendant Modbus master such as the Eaton Power Distribution Monitoring and Control system or separately wired I O buttons Controller can be mounted to the left side preferred or right side of the cassette If placed in other areas of the switchgear extension wires can be added with the existing terminal blocks The eight MR2 tertiary wires connect the controller to the M...

Page 4: ...e are three methods to restrict racking a Magnum circuit breaker Option 1 lockout tagout This option prevents both electrical and manual operation Push the padlock slider forward towards the breaker aligning two holes on the left side and insert a padlock see Figure 7 The MR2 will be disabled via the permissive circuit and manual racking is blocked as well The label on the levering door will show ...

Page 5: ...acking Racking indication While electrical or manual racking there exists three discrete colored positions which are disconnect green test yellow and connect red see positions A B and C in Figure 12 At these positions the breaker can be closed when the racking door is fully lowered Figure 12 Discrete colored positions If racking is stopped electrically or manually in between disconnect test or tes...

Page 6: ...available Modbus addresses are 01 to 99 for one RS485 network To set the Modbus address follow the steps below 1 Connect pendant to the controller to be programmed 2 Hold down the Intermediate button and within three seconds press and hold the Connect button until the two digit LED display begins to flash at the same time the Connect LED will begin to flash 3 Now the Test and Disconnect buttons ca...

Page 7: ...ch of the control options Pendant I O and Modbus The Enable button must be held to operate the pendant 1 Insert the breaker into the breaker cell a The breaker is now in the disconnect position b The solid green disconnect LED will be illuminated c To proceed further and rack the breaker to the connected position the breaker must be open If the breaker is closed you will see an E5 code Refer to th...

Page 8: ...communications E3 Motor timed out Condition when motor continues to run in excess of the normal required time to reach the desired position This error state condition can be caused from a malfunction of the MR2 Operator should shut off power to the MR2 controller by tripping the circuit breaker or fuse protecting the controller and manually rack out the Magnum breaker Once the Magnum breaker is re...

Page 9: ...RI RO OC AD 1 2 3 4 5 6 7 8 1 Product group 2 Gear type will always be 02 for Magnum 3 Controller firmware version 4 Pendant firmware version 5 Rack in count 6 Rack out count 7 Overcurrent count 8 Modbus address 01 to 99 Controller mounting The controller can be mounted to the left side or right side of the cassette If placed in other areas of the switchgear extension wires can be added with the e...

Page 10: ...ube is not present please contact Eaton Technical Support and order with style shown in Table 3 Magnalube can be added to the leading edges and surfaces on all primary disconnects that make contact with the cassette stabs Table 3 Greases used on Magnum PXR and PD SB Grease type Desription Magnalube G Eaton standards 53701AI Color Green Manufactured by Saunders Enterprises inc 11 51 44th Road Long ...

Page 11: ...11 Instructional Booklet IB013003EN Effective June 2023 Instructions for installation operation and maintenance of Magnum MR2 integral racking EATON www eaton com Notes ...

Page 12: ...een the parties This literature is not intended to and does not enlarge or add to any such contract The sole source governing the rights and remedies of any purchaser of this equipment is the contract between the purchaser and Eaton NO WARRANTIES EXPRESSED OR IMPLIED INCLUDING WARRANTIES OF FITNESS FOR A PARTICULAR PURPOSE OR MERCHANTABILITY OR WARRANTIES ARISING FROM THE COURSE OF DEALING OR USAG...

Reviews: