USING THE WEB INTERFACE
EATON
Managed ePDU
t
User’s Guide
S
164201xxx Rev 1
DRAFT 10−OCT−2008
55
Setting the ePDU Thresholds
To set the ePDU thresholds:
1.
Select
Device Settings
, and then select
Unit Setup
. The Unit Setup page displays
(see Figure 51).
Figure 51. Unit Setup Page
2.
Type a number in the
Delay until outlets are switched on again after outlet reset
field.
When the outlets on the ePDU are power cycled, they are turned off and then
back on. The number you enter here determines the length of time (in seconds) it
takes for the outlets to turn back on after they are shut down during the power
cycle. The default is 10 seconds.
NOTE
The number you enter here applies to all outlets on the ePDU. However, you can override this
number for specific outlets. See Setting Outlet Thresholds" on page 58. You can power cycle an outlet from
the Outlet Details page. See Power Cycling an Outlet" on page 59 for instructions.
3.
Type a number of seconds in the
Sequence Delay
field. The default is
200 milliseconds.
4.
Set the RMS voltage, current, and temperature thresholds for the ePDU in the
Thresholds
panel. For each setting, enter critical and non−critical thresholds.
5.
Click
Apply
. The delays and thresholds are applied.
Summary of Contents for Managed ePDU
Page 1: ...Managed ePDU User s Guide...
Page 4: ......
Page 10: ...TABLE OF CONTENTS EATON Managed ePDUt User s Guide S 164201xxx Rev 1 DRAFT 10 OCT 2008 vi...
Page 16: ...SAFETY WARNINGS EATON Managed ePDUt User s Guide S 164201xxx Rev 1 DRAFT 10 OCT 2008 6...
Page 20: ...RACK MOUNTING THE EPDU EATON Managed ePDUt User s Guide S 164201xxx Rev 1 DRAFT 10 OCT 2008 10...
Page 128: ......
Page 129: ...164201xxx1 164201xxx 1...