Page 11
SK-90610-Y4_EN
ENGLISH
4. Power cables connection
This type of connection must be carried out by qualified electrical personnel.
Before carrying out any connection, check that the upstream protection device (Normal AC source)
is open "O" (Off).
Before proceeding to connect the HotSwap MBP to the UPS, make sure the UPS has been properly shut
down (refer to the UPS user manual).
Always connect the ground wire first.
4.1 MBP6K208
1. Remove the L6-30P input power cable from the UPS I/O terminal blocks – refer to the UPS user manual for
UPS I/O terminal blocks cover access.
2. Connect the 2 power cables of I/O cord Set
(1)
to the UPS I/O terminal blocks, following color coding on
the cables and the UPS I/O cover (blue for UPS Input / red for UPS Output) – refer to the UPS user manual
to check the UPS terminal blocks connection.
3. Connect the MBP detection cable from the I/O cord Set
(1)
to the specific UPS connector (MBP detect,
refer to UPS User Manual).
Only with compatible EATON UPS, contact your Eaton reseller for more information.
4. Slide the MBP I/O cover
(2)
after removing the 4 screws, to access to MBP terminal blocks.
5. Punch the knockouts and insert the provided
cable glands inside.
6. Insert the L6-30P input power cable through the
cable gland.
7. Connect the wires to the Normal AC source (Input)
terminal blocks.
8. Insert the Output cable through the cable gland.
9. Connect the wires to the Output terminal blocks.
10. Tighten the cable glands.
11. Slide back and secure the MBP I/O cover
(2)
with the 4 screws.
12. Connect the I/O cord Set
(1)
connector to the MBP, and secure it by fixing the 2 locking screws.
ion
1
2
Utility
Power
Load
to UPS output
RJ11 MBP detection
to UPS Normal
AC Source
OUTPUT
L1 L2
t
INPUT
L1 L2
t
2
OUTPUT
L1 L2
t
INPUT
L1 L2
t
Output cable
Normal AC Source
cable
2
1
1