12
Unit installation
SPLIT RACK AIR CONDITIONER USER MANUAL
UM.ICUBE2.0-SRAC.SG.0822 August 2022 www.eaton.com
Tool names
Schematic diagrams
Specifications
Usage
Silver brazing rod
Low silver electrode should be
selected, ≤ 20% Ag
For welding copper pipe
Pliers
Special welding pliers
For welding clamp pipe
Tape measure
Measuring range, ≥ 5m
Measure installation size and installation
distance.
Measure the length of copper tube
Multimeter
Digital display clamp current meter
It is used to check the voltage of the
power supply and judge whether the
power supply is normal or not.
It is used for starting and debugging
to check whether the current of the
compressor is normal.
Horizontal ruler
——
Leveling during installation
Wire pressing forceps
Used for crimping OT segments and tube
terminals
Press OT segments, tube terminals, etc.
2.6.2 Installation material preparation
Serial number
Specifications
Remarks
The indoor and outdoor units are connected with
copper pipes and related thermal insulation.
Please refer to “2.6 Pipeline connection” to
select the relevant specifications.
It is related to the type of the unit and the length of the
pipe.
Gravity drain pipe
Hard PVC pipe: outside diameter f 22x6 mm
Strong drain pipe
Soft PVC tube: outside diameter
f
7x3mm
Gravity drain pipe adapter
PVC pipe adapter: G1 / 2” external thread
joint
Match with gravity drain pipe
Strong drain pipe adapter
Double pagoda adapter: outside diameter
f
4mm
Match with strong drain pipe
Indoor unit power cord
3x2.5 mm2
The power cord to connect the indoor and
outdoor units
3x2.5 mm2
The signal lines to connect the indoor and
outdoor units
2x2.5 mm2
Power terminal
M4 OT Terminal
Connect the outdoor unit side
Power terminal
E2512
-
E1512 Tubular terminal
Connect the indoor unit side