Setting and commissioning the
device
26
05/08 AWB2528-1611en
Initial Commissioning
Prior to initial commissioning, the station number (NodeID)
of the MFD-CP4-CO is set as follows via the display:
X
Connect the power supply.
X
Press the DEL and ALT buttons simultaneously. The Setup
menu is displayed. The cursor is in the first line on the
NodeID parameter.
X
Press the OK button and select the required addresses
with the
ú
and
í
buttons.
X
Press the OK button again to save the value.
The next time the power supply is switched off and on the
device will try to connect to the new address.
j
Danger!
The display/operator system must only be run if it is prop-
erly mounted and installed:
• The installation must comply with regulations for elec-
tromagnetic compatibility (EMC).
• MFD-CP4-CO is designed to be installed in an enclo-
sure, switch cabinet or distribution board.
• If the display/operator system is switched on, the
controlled devices should not respond in an uncon-
trolled manner, e.g. uncontrolled motor startups.