GANGING THE ENCLOSURES
Vertical Cabinet Dividers must be installed before ganging adjacent enclosures frames together. Refer
to
Vertical Cabinet Divider instructions
.
Standard Ganging (Non-electrically Isolated)
1. Position and level the adjacent enclosure frames. Ensure that the frames are precisely aligned both vertically and
front-to-back.
2. Bolt the adjacent frames together with six 5/16-18 x ½” button head cap screws and 5/16-18 locking nuts. See
figure
7-3
.
3. The enclosures’ top trim channels may be loosened and aligned if required.
4. Insert filler strips between adjacent frames, one at the front and one at the rear. See figure
7-4
.
Figure
7-3
5/16”-18 self-locking nuts
Top trim
channel
Vertical cabinet dividers
(Install before ganging
frames. See page 34.)
5/16”-18 x 1/2” button
head cap screws
Enclosure frames
Figure
7-4
Filler strip
Enclosure uprights
(top view)
12
Pub Num: MN159002EN rev1.0
Paramount Enclosure
Installation Guide