3. Installation Overview
Factory Assembled Enclosures
Paramount Enclosures are usually shipped as fully configured and assembled cabinets, ready for installation into
your data center. Only a few simple steps are required to prepare the cabinet for the installation of your electronic
equipment. If you are preparing factory assembled units, many of the procedures in this manual will not apply to
your installation.
Follow the steps in the
“Unpacking a Factory Assembled Enclosure”
and “
Setting Up Factory Assembled Enclo-
sures”
. After your enclosures have been positioned, stabilized and ganged, refer to the
“Field Assembled Components”
section for any additional accessories that may require installation.
Field Assembled Enclosures
To meet the needs of some users, Wright Line may ship the Paramount Enclosure Frames in a partially disassembled
state, requiring additional field assembly procedures. Refer to the
“
Field Assembled Enclosure Frames”
section
and the
“
Field Assembled Components
”
section for frame and accessory assembly instructions.
After you have completed the frame and accessory assembly, return to the “
Setting Up Factory Assembled Enclo-
sures”
section for instructions on stabilizing and ganging the enclosures.
Contents of This Packet
In addition to the Installation Manual, this packet contains a 1-3/8” wrench and a 5/32” allen wrench. Use the 1-3/8”
wrench to adjust the enclosure’s leveling feet. Use the 5/32” allen wrench to assemble
“knock-down”
style enclosure
frames.
1-3/8” Wrench
5/32” Allen Wrench
3
Pub Num: MN159002EN rev1.0
Paramount Enclosure
Installation Guide
Summary of Contents for Paramount Enclosure
Page 1: ...Eaton Data Center Racks...
Page 2: ...U...