10
Series NRX with PXR - Instructions for
Spring Release, Latch Check Switch,
and Motor Operator
EATON
www.eaton.com
Instruction Leaflet
IL0131088EN
Effective May 2015
Figure 22. Step 8.
Step 9:
The installed motor operator should look as shown with
secondary leads extending up and ready to be made.
Figure 23. Step 9.
Step 10:
Make the appropriate secondary connections as outlined
in Section 9. If necessary, bundle secondary wires using industry-
accepted wire tie practices.
ote:
N
If an externally wired latch check switch and a motor operator are installed
together, a simple secondary wiring change must be made. Remove the latch
check switch’s secondary connector plug as described in Section 9. Once
removed, disconnect the latch check switch’s secondary lead (#39-NF, #51-RF)
from the connector plug by inserting the terminal extraction tool (included in
the externally wired latch check switch kit) into the end of the connector plug
as shown. The tool releases the lead so it can be removed from the other end.
The connector plug can be discarded. The latch check switch’s disconnected
lead (#39-NF, #51-RF) is now reconnected into the open secondary location
in the motor operator’s connector plug. No tool is required to make this
connection. It is, however cautioned that the connector plug must be oriented
as shown in Figure 26 before making the connection. Gently push the lead into
the connector’s open spot, and it will easily connect and lock into place.
Figure 24.
#39-NF
#51-RF
Open
Secondary
#40-NF
#52-RF
Step 10.
Figure 25. Step 10
Secondary
Lead
Connector
Plug
Terminal
Extraction
Tool
.
Figure 26. Step 10.
Step 11:
Replace the front cover, and secure it in place with the four
mounting screws previously removed in Step 1.