11
Instruction Leaflet
IL0131088EN
Effective May 2015
Series NRX with PXR - Instructions for
Spring Release, Latch Check Switch,
and Motor Operator
EATON
www.eaton.com
Section 8: Removal of Motor Operator
Proceed with the following five steps.
Step 1:
If necessary, remove the front cover from the breaker by
performing Steps 1 and 2 of Section 2.
Step 2:
Locate the motor operator and disconnect the appropriate
secondary connections as described in Section 9.
Figure 27. Step 2.
Step 3:
Remove the motor operator from the circuit breaker by using
an Allen wrench to unscrew the captive motor operator mounting
screws (2 screws for NF and 3 screws for RF).
Figure 28. Step 3.
Step 4:
Complete removal of the motor operator by pulling it out
(Figure 29).
Figure 29. Step 4.
Step 5:
Repeat Steps 4 through 11 of Section 7 if another motor
operator is to be installed. If not, just complete Step 11 of Section 7.