106
Eaton
®
Power Xpert
®
9395P-900 Installation and Operation Manual 164000501—Rev 12
Figure 55. Hot Sync CAN Bridge Card.
Plug-in Terminal
Block J3
NOTE
Only one Hot Sync CAN Bridge Card can be installed in the UPS. Multiple CAN cards are
not supported and will cause system conflicts.
To install the card:
1.
Verify the UPS system is turned off and all power sources are removed. See
for shutdown instructions.
2.
Unfasten the front door latch and swing the door open (see
3.
Install the Hot Sync CAN Bridge Card into an open X-Slot communication bay on the front of the UPS. See
and
for X-Slot communication bay locations.
To locate the appropriate terminals on the Hot Sync CAN Bridge Card, see
and
.