Eaton
®
Power Xpert
®
9395P-900 Installation and Operation Manual 164000501—Rev 12
41
Table 12. 415V Input/Output Ratings and External Wiring Requirements for the Three/Four UPM Models – Common
Battery
Basic Unit Rating
Units
Rating 50/60 Hz
kVA
kW
450
450
500
500
550
550
600
600
675
675
750
750
825
825
Input and Output Voltage
Volts
415/415 415/415 415/415 415/415 415/415 415/415 415/415
AC Input to UPS Rectifier (0.98 Minimum
pF)
Full load current plus battery recharge current
(3) Phases, (1) Ground
A
Amps
770
856
942
1027
1156
1284
1412
Minimum Conductor Size
Number per Phase
AWG or kcmil
(each)
500
(4)
500
(5)
500
(5)
500
(6)
500
(6)
500
(8)
500
(8)
AC Input to UPS Bypass (Five Wire)
Full Load Current
(3) Phases, (1) Neutral, (1) Ground
B
Amps
626
696
765
835
939
1043
1148
Minimum Conductor Size
Number per Phase
AWG or kcmil
(each)
500
(3)
500
(4)
500
(4)
500
(5)
500
(5)
500
(6)
500
(6)
DC Input from Battery Disconnect to UPS
(1) Positive, (1) Negative
C
Total Amps
987
1096
1206
1316
1480
1645
1809
Minimum Conductor Size
Number per Phase
(1) Positive, (1) Negative
AWG or kcmil
(each)
500
(6)
500
(6)
500
(6)
500
(8)
500
(8)
500
(8)
500
(10)
AC Output to Critical Load (Five Wire)
Full Load Current
(3) Phases, (1) Neutral, (1) Ground
D
Total Amps
626
696
765
835
939
1043
1148
Minimum Conductor Size
Number per Pole
AWG or kcmil
(each)
500
(3)
500
(4)
500
(4)
500
(5)
500
(5)
500
(6)
500
(8)
NOTE: Callout letters
A
,
B
,
C
, and
D
map to
. Callout letters
A
,
C
, and
D
map to
NOTE: Bypass wiring data is not applicable to IOM configurations.
Battery Conductor Sizing
: Eaton strongly recommends using the specified DC conductor size and quantity shown above for
optimum system performance and battery run time.
Battery Cable Routing Requirements
Conduit applications:
* Each conduit must have a Positive, Negative, and Ground conductor.
* There must be an equal number of positive and negative conductors in a single conduit. Only one ground conductor is required in
each conduit.
Raceway applications:
* Positive and negative battery cables must be run side by side in the raceway in an alternating pattern (+ - + - + - + -).
* There must be a ground cable running in the raceway with the battery cables.
NOTE If a 4-pole Automatic Transfer Switch (ATS) is used to connect the UPS to a generator or alternative input source, it may
interrupt the UPS input neutral during its transition between sources. For the 9395P UPS:
The ATS transition must be open in both directions. The "break" time for the contacts must be at least 50 ms. This allows the UPS to
operate properly,
however it is important to evaluate whether the critical load will function properly as its neutral reference is rapidly
(50 ms) switched. Note also that if the UPS load is on bypass, an ATS switchover with interruption of the neutral, will interrupt the
return current path and cause a loss of all phase-to-neutral loads.
If an overlapping neutral or make-before-break ATS switch is used, the neutrals must overlap for a minimum of 50 ms during the
transition.