Eaton
®
Power Xpert
®
9395P-900 Installation and Operation Manual 164000501—Rev 12
155
C
Chhaapptteerr 77 U
UP
PS
S O
Oppeerraattiinngg IInnssttrruuccttiioonnss
This section describes how to operate the UPS.
NOTE 1
Before starting the UPS, ensure all installation tasks are complete and a preliminary
startup has been performed by authorized service personnel. The preliminary startup
verifies all electrical interconnections to ensure the installation was successful and the
system operates properly.
NOTE 2
Read this section of the manual and have thorough knowledge of UPS operation before
attempting to operate any of the controls.
NOTE 3
The UPS displays two minutes of battery runtime at the initial startup. After a 24-hour
charging period, the UPS automatically runs a battery test and the correct battery
runtime displays.
77..11
U
UP
PS
S C
Coonnttrroollss aanndd IInnddiiccaattoorrss
The controls and indicators identified and described in this section are used to control and monitor UPS
operation.
Identifies the touchscreen control panel and the location of the CB1 circuit breaker
(optional).
Figure 91. UPS Controls and Indicators
Input Breaker
CB1 (optional)
AC
Touchscreen
Control Panel
ISBM
ISBM
(Right Door
Removed)