77..44..1100 S
Sttaarrttiinngg aa S
Siinnggllee U
UP
PM
M ttoo O
Onnlliinnee M
Mooddee
To start a single UPM:
If required to close a circuit breaker inside a UPS, use appropriate personal protective equipment. Injury to
personnel may occur from electrical shock.
NOTE
UPM 1 is used in this procedure. Use the same procedure to start any UPM as
applicable.
1.
Unfasten the front door latch and swing the door open (see
).
NOTE
*Only perform steps 2 and 5 if the UPS has an input breaker CB1 (see
).
2.
*Verify that input breaker CB1 is open.
3.
Close the UPS input feeder circuit breaker.
4.
Close the UPS Bypass input feeder circuit breaker.
5.
*Close input breaker CB1.
6.
Close the door and secure the latch.
7.
Close the battery breaker.
8.
Observe the UPS control panel becoming active, indicating logic power.
9.
Make sure you are logged in for user access (see
).
10. Press the
Controls
button on the
Home
screen (see
). The
System Status
screen is displayed
(see
11. On the System Status screen, the UPS status should indicate
Shutdown
and the UPM status should
indicate
Shutdown
.
12. Verify no alarms are active.
13. On the System Status screen, select the
Module Controls
button. The Module Controls screen is
displayed (see
).
14. Select the detail button of the UPM to start. The
Module Controls Detail
screen for the selected UPM
appears (see
).
15. Press the
Go to Normal
button in the Power Status section. Select
Yes
on the confirmation screen.
Verify the following:
•
The message
UPM 1 IS STARTING
appears.
•
The UPM 1 rectifier and inverter turn on.
•
UPM 1 Power Status line shows
idle
.
•
The UPM 1 status bar shows in a gray color (Idle).
16. To transfer the UPM to Online mode, select the
Go to Normal
button under the Power Status section.
•
The UPM 1 Power Status shows
Active
•