Chapter 4
Installation
4.1
Preliminary Installation Information
W
A
R
N
I
N
G
Installation should be performed only by qualified personnel knowledgeable of batteries and their associated
precautions. Keep unauthorized personnel away from battery cabinets.
C
A
U
T
I
O
N
The 1085
and
1085HR
battery cabinets CANNOT be intermixed. Serious damage to equipment may result.
Observe these precautions when working on or around battery cabinets:
S
Remove watches, rings, or other metal objects.
S
Use tools with insulated handles.
S
Wear rubber gloves and boots.
S
Do not lay tools or metal parts on top of batteries or battery cabinets.
Refer to the following while installing the battery system:
S
Chapter 3 for cabinet dimensions, equipment weight, wiring and terminal data, and
installation notes.
S
Refer to the applicable Power Xpert 9395 UPS Installation and Operation Manual
listed in paragraph 1.7 for UPS cabinet conduit and terminal specifications and
locations.
S
The conduit landing plates are to be removed to add conduit landing holes as
required. Plate material is 16 gauge steel (1.5 mm/0.06
”
thick).
S
The recommended installation location for battery cabinets located adjacent to the
UPS is on the right side of the UPS cabinet. This location will allow for future
expansion using an external module.
4.2
Unloading the Battery Cabinet from the Pallet
The battery cabinet is bolted to a pallet consisting of four angle metal supports
secured to two four-inch by six-inch wood supports.
W
A
R
N
I
N
G
The battery cabinet is heavy. See Table 3‐1 for weight of cabinets. If unloading instructions are not closely
followed, the cabinet may cause serious injury.
C
A
U
T
I
O
N
S
Do not tilt cabinets more than 10° from vertical.
S
Lift the cabinet only with a forklift or damage may occur.