INSTALLATION
Power Xpert 9395 Integrated Battery Cabinet (Model 1085 and 1085HR) Installation Manual
S
164201687 Rev 4
www.eaton.com/powerquality
4-2
NOTE
For the following steps, verify that the forklift is rated to handle the weight of the cabinet (see
Table 3‐1 for cabinet weight).
1.
If not already accomplished, use a forklift to move the cabinet to the installation
area, or as close as possible, before unloading from the pallet. Insert the forklift
from the front of the cabinet (see Figure 4‐1).
2.
Unfasten the front door latch and swing the doors open.
3.
Remove the doors. Remove the retaining screw located inside each door at the
bottom hinge pivot point, then lift the door off. Save the retaining screws for
re-installation of the doors.
4.
Locate the field kit (packed inside of the cabinet). Locate the four 1/2
”
jacking
bolts and install them in the threaded holes in the front and rear supports. Place a
floor protector underneath each jacking bolt, and screw the bolts down against
them. The floor protectors protect the floor from being marred by the jacking
bolts. Retain the remaining parts of the field kit for later use.
Floor Protector
(Step 4)
Left-hand
Door (Step 2)
4
6 Support
Front Support
4
6 Support
Jacking Bolt
(Step 4)
Side Support
Cabinet Support
Hardware (Step 10)
Figure 4‐1. Removing Shipping Supports
5.
Loosen, but do not remove, the hardware holding the 4
6 supports to the front
and rear supports.
W
A
R
N
I
N
G
SERIOUS INJURY MAY OCCUR. Battery cabinets are extremely heavy. If unloading instructions are not
closely followed, cabinet may tip.
6.
Turn each jacking bolt consecutively, two full turns, until the 4
6 supports clear
the floor by approximately 3 mm (1/8
”
).