36
Eaton Power Xpert 9395C UPS Installation and Operation Manual 164000821—Rev 06
Figure 14. Removing the ISBM Section Right Side Shipping Bracket
Right Side Shipping
Bracket
Wireway Panel
ISBM Removable
Front Panel
Shipping Bracket
Bolts
Shipping Bracket
Bolts
Pallet
4.
Using a forklift (see the caution statement at the beginning of this procedure), raise the cabinet until the
cabinet bottom clears the pallet by approximately 3 mm (1/8”).
5.
Pull the pallet from under the cabinet. Discard or recycle the pallet and shipping brackets in a responsible
manner.
6.
Carefully lower the cabinet until the cabinet base contacts the floor.
7.
Repeat Steps 2 through 6 for the remaining cabinet.
8.
Proceed to paragraph
Distributed Bypass Tie Cabinet Installation
.
Summary of Contents for Power Xpert 9395C
Page 8: ......
Page 175: ...16400082106 164000821 06...