Using a forklift with the forks in the front forklift slots, move the PM section to the final installation
location.
2.
On the ISBM section, remove one top screw and two bottom screws securing the PM section wireway
panel (see
). Lift the panel straight up to remove it from the panel hanger brackets at the top of
the cabinet.
3.
Remove the screws securing the top and bottom internal safety shield panels and remove the panels.
Retain the hardware for later use.
Figure 17. Section Joining
Wireway Panel
ISBM Section
Use care during installation to protect components mounted on the right side of the ISBM section and the
intercabinet wiring harnesses attached to the left side PM section from damage.