Eaton Power Xpert 9395C UPS Installation and Operation Manual 164000821—Rev 06
33
C
Chhaapptteerr 44 U
UP
PS
S S
Syysstteem
m IInnssttaallllaattiioonn
44..11
P
Prreelliim
miinnaarryy IInnssttaallllaattiioonn IInnffoorrm
maattiioonn
Installation should be performed only by qualified personnel.
L’installation ne doit être effectuée que par du personnel qualifié.
Refer to the following while installing the UPS system:
•
UPS Installation Plan and Unpacking
for cabinet dimensions, equipment weight, wiring and
terminal data, and installation notes.
•
Do not tilt the cabinet more than ±10° during installation.
•
Remove the conduit landing plates to add conduit landing holes as required. Plate material is 16 gauge
steel (1.5 mm/0.06" thick).
•
If perforated floor tiles are required for ventilation, place them in front of the UPS.
44..22
U
Unnllooaaddiinngg tthhee U
UP
PS
S C
Caabbiinneett ffrroom
m tthhee P
Paalllleett
The ISBM and PM sections are bolted to separate wooden pallets supported by wood skids. To remove the
pallets:
The ISBM with PM section is heavy (see
). If unpacking and unloading instructions are not closely
followed, the cabinet may tip and cause serious injury.
AVERTISSEMENT!
Les sections de l’onduleur sont lourdes (voir le
). Suivre attentivement les instructions de déchargement
et de déballage pour éviter de renverser les armoires, ce qui pourrait causer de graves blessures.
Summary of Contents for Power Xpert 9395C
Page 8: ......
Page 175: ...16400082106 164000821 06...