UPS SYSTEM INSTALLATION
Eaton Power Xpert 9395P-1200 UPS (1200 kVA, 1200 kW) Installation and Operation Manual
S
P-164000500 Rev 4
www.eaton.com/powerquality
4-13
NOTE
Two cable lugs will be connected to each terminal stud. When connecting the cable lugs, install the first lug on the stud with the raised
barrel portion facing the back of the cabinet. Install the second lug with the raised barrel portion facing the front of the cabinet.
NOTE
On a UPS without CB1, UPM input wiring terminations are in the same positions on the bus bars installed in the place of CB1.
NOTE
On a UPS configured as an IOM, UPM input wiring terminations are the same as an ISBM configuration.
UPM 2 Cable 2G1 & 2G2 Brown
UPM 3 Cable 3G1 & 3G2 Brown
Phase B (E2A)
UPM 1 Cable 1G1 & 1G2 Brown
Phase B (E2A)
UPM 4 (FI-UPM) Four UPM Model
AC Input to UPMs
UPM 1 Cable 1G1 & 1G2 Yellow
Phase C (E3A)
UPM 2 Cable 2G1 & 2G2 Yellow
UPM 3 Cable 3G1 & 3G2 Yellow
UPM 4 (FI-UPM) Four UPM Model
UPM 4 (FI-UPM) Four UPM Model
UPM 1 Cable 1G1 & 1G2 Orange
UPM 2 Cable 2G1 & 2G2 Orange
UPM 3 Cable 3G1 & 3G2 Orange
Phase A (E1A)
Figure 4‐9. ISBM Section Input Power Terminal Detail