Eaton
®
Power Xpert
®
9395P-600 (300V-600V) Installation and Operation Manual 164000710—Rev 07
65
C
Chhaapptteerr 44 IInnssttaallllaattiioonn
44..11
P
Prreelliim
miinnaarryy IInnssttaallllaattiioonn IInnffoorrm
maattiioonn
Installation should be performed only by qualified personnel.
AVERTISSEMENT!
L’installation ne doit être effectuée que par du personnel qualifié.
Refer to the following while installing the UPS system:
•
Chapter 3 for cabinet dimensions, equipment weight, wiring and terminal data, and installation notes.
•
Do not tilt the cabinets more than ±10° during installation.
•
Remove the conduit landing plates to add conduit landing holes as required. Plate material is 16 gauge
steel (1.5 mm/0.06" thick).
•
If perforated floor tiles are required for ventilation, place them in front of the UPS.
44..22
U
Unnllooaaddiinngg tthhee IIS
SB
BM
M w
wiitthh U
UP
PM
M S
Seeccttiioonn ffrroom
m tthhee P
Paalllleett
The ISBM cabinet section is bolted to a wooden pallet supported by wood skids. The UPM cabinet section is
also bolted to a wooden pallet supported by wood skids. The optional field-install UPM (FI-UPM) section is
delivered bolted to a wooden pallet supported by wood skids as well. Once unloaded, these sections are
mechanically and electrically joined. Together, they are referred to as the UPS.
The ISBM with UPM or UPMs section is heavy (see
). If unpacking and unloading instructions are not
closely followed, the cabinets may tip and cause serious injury.
AVERTISSEMENT!
Les sections de l’onduleur sont lourdes (voir le tableau
). Suivre attentivement les instructions de
déchargement et de déballage pour éviter de renverser les armoires, ce qui pourrait causer de graves
blessures.
Summary of Contents for Power Xpert 9395P-600/600
Page 8: ......
Page 226: ...16400071007 164000710 07...