100
Eaton
®
Power Xpert
®
9395P-600 (300V-600V) Installation and Operation Manual 164000710—Rev 07
44..1111
IInnssttaalllliinngg O
Oppttiioonnss,, A
Acccceessssoorriieess,, aanndd D
Diissttrriibbuutteedd B
Byyppaassss C
Coonnttrrooll W
Wiirriinngg
To install options, accessories, and distributed bypass control wiring, see
Installing Options and Accessories
.
44..1122
IInniittiiaall S
Sttaarrttuupp
Startup and operational checks must be performed by an authorized Eaton Customer Service Engineer, or the
warranty terms become void (see Section ). This service is offered as part of the sales contract for the UPS
system. Contact an Eaton service representative in advance (usually a two-week notice is required) to reserve a
preferred startup date.
44..1133
C
Coom
mpplleettiinngg tthhee IInnssttaallllaattiioonn C
Chheecckklliisstt
The final step in installing the UPS system is completing the following Installation Checklist.
This checklist ensures that you have completely installed all hardware, cables, and other equipment. Complete
all items listed on the checklist to ensure a smooth installation. Make a copy of the Installation Checklist before
filling it out, and retain the original.
After the installation is complete, an Eaton Customer Service Engineer must verify the operation of the UPS
system and commission it to support the critical load. The service representative cannot perform any
installation tasks other than verifying software and operating setup parameters. Service personnel may request
a copy of the completed Installation Checklist to verify all applicable equipment installations have been
completed.
Summary of Contents for Power Xpert 9395P-600/600
Page 8: ......
Page 226: ...16400071007 164000710 07...