9395P-600 (300V-600V) Installation and Operation Manual 164000710—Rev 07
37
Table 7. 600V Input/Output Ratings and External Wiring Recommendations for the One/Two/Three UPM Common Battery
Basic Unit Rating
Units
Rating 50/60 Hz
kVA
kW
300
300
400
400
450
450
500
500
550
550
Input and Output Voltage
Volts
600
600
600
600
600
AC Input to UPS Rectifier (0.98 Minimum pF)
Full load current plus battery recharge current
(3) Phases, (1) Ground
A
Amps
360
480
541
600
640
Minimum Conductor Size
Number per Phase
AWG or kcmil
(each)
3/0 (2)
or
1/0 (3)
300 (2)
or
3/0 (3)
400 (2)
or
4/0 (3)
400 (2)
or
4/0 (3)
500 (2)
or
250 (3)
AC Input to UPS Bypass
Full Load Current
(3) Phases, (1) Ground
B
Amps
289
385
433
481
529
Minimum Conductor Size
Number per Phase
AWG or kcmil
(each)
400 (1)
or
2/0 (2)
4/0 (2)
or
1/0 (3)
250 (2)
or
2/0 (3)
300 (2)
or
3/0 (3)
500 (2)
or
250 (3)
DC Input from Battery Disconnect to UPS
(1) Positive, (1) Negative
C
Total Amps
676
901
1014
1126
1239
Minimum Conductor Size
Number per Pole
(1) Positive, (1) Negative
AWG or kcmil
(each)
500
(2)
500
(3)
500
(3)
500
(4)
500
(5)
AC Output to Critical Load
Full Load Current
(3) Phases, (1) Ground
D
Amps
289
385
433
481
529
Minimum Conductor Size
Number per Pole
AWG or kcmil
(each)
400 (1)
or
2/0 (2)
4/0 (2)
or
1/0 (3)
250 (2)
or
2/0 (3)
300 (2)
or
3/0 (3)
500 (2)
or
250 (3)
NOTE: Callout letters
A
,
B
,
C
, and
D
map common battery systems. Callout letters
A
,
C
, and
D
map to separate battery systems. See
through
.
NOTE: Bypass wiring data is not applicable to IOM configurations.
Battery Conductor Sizing
: Eaton strongly recommends using the specified DC conductor size and quantity shown above for
optimum system performance and battery run time.
Battery Cable Routing Requirements
Conduit applications:
* Each conduit must have a Positive, Negative, and Ground conductor.
* There must be an equal number of positive and negative conductors in a single conduit. Only one ground conductor is required in
each conduit.
Raceway applications:
* Positive and negative battery cables must be run side by side in the raceway in an alternating pattern (+ - + - + - + -).
* There must be a ground cable running in the raceway with the battery cables.
NOTE If a 4-pole Automatic Transfer Switch (ATS) is used to connect the UPS to a generator or alternative input source, it may
interrupt the UPS input neutral during its transition between sources. For the 9395P UPS:
The ATS transition must be open in both directions. The "break" time for the contacts must be at least 50 ms. This allows the UPS to
operate properly,
however it is important to evaluate whether the critical load will function properly as its neutral reference is rapidly
(50 ms) switched. Note also that if the UPS load is on bypass, an ATS switchover with interruption of the neutral, will interrupt the
return current path and cause a loss of all phase-to-neutral loads.
If an overlapping neutral or make-before-break ATS switch is used, the neutrals must overlap for a minimum of 50 ms during the
transition.