UPS System Installation
4-6
Eaton
®
Power Xpert
®
9395P-900 UPS Installation and Operation Manual
P-164000501—Rev 09
www.eaton.com/powerquality
Figure 4-4. Removing the UPM Section Right Side Shipping Bracket
4.3
Mechanically Joining the Sections
1.
Using a forklift, move the UPM section to the final installed location.
2.
Remove one top screw and two bottom screws securing the UPM section wireway panel (see Figure 4-5).
Lift the panel straight up to remove it from the panel hanger brackets at the top of the cabinet.
3.
Remove the screws securing the top and bottom internal safety shield panels and remove the panels.
Retain the hardware for later use.
4.
Remove the screws securing the corner channel and remove the channel (see Figure 4-5). Retain the
hardware for later use.
Shipping Bracket
Bolts
Shipping Bracket
Bolts
Pallet
Right Side Shipping
Bracket
NOTE
The following procedure permits the UPS sections to be installed in a location
where there is limited space to slide the sections together from the sides.
NOTE
For the following steps, verify that the forklift or pallet jack is rated to handle the
weight of the section (see Table 3-1 for cabinet weight).
Summary of Contents for Power Xpert 9395P-900 Series
Page 2: ......
Page 8: ...This page intentionally left blank...
Page 33: ...Section I Installation...
Page 34: ......
Page 139: ...Section II Operation...
Page 140: ......
Page 231: ......
Page 232: ...P 164000501 6 P 164000501 9...