Figure 4-8. ISBM Section Intercabinet Power Terminal Locations
NOTE
On a UPS configured with a Continuous Static Switch (CSS), CB4 is not installed.
NOTE
On a UPS configured as an Input Output Module (IOM), CB4 is not installed.
(See Figure 4
‐
9
for detail.)
AC Input to UPMs
AC Output
from UPMs
Phase C
Phase A
Phase B
Neutral from UPMs
(See Figure 4
‐
11
for detail.)
(See Figure 4
‐
11 for detail.)
Phase C
Phase A
Phase B
(See Figure 4
‐
10 for detail.)
AC Input Breaker CB1
DC Input to UPMs – (E5)
(See Figure 4
‐
10 for detail.)
DC Input to UPMs + (E4)
For 4-wire systems only
Summary of Contents for Power Xpert 9395P-900 Series
Page 2: ......
Page 8: ...This page intentionally left blank...
Page 33: ...Section I Installation...
Page 34: ......
Page 139: ...Section II Operation...
Page 140: ......
Page 231: ......
Page 232: ...P 164000501 6 P 164000501 9...