INSTALLATION REFERENCE
EATON
Powerware
®
225 kVA PDU Installation and Operation Manual
S
164201629 Rev D
www.powerware.com
A−53
18
13
UCB
Building Alarm 1
Building Alarm 1 Return
Building Alarm 2
Building Alarm 2 Return
REPO
REPO Return
Local EPO (factory wired)
Local EPO Return (factory wired)
Alarm Relay Common
Alarm Relay NO
Alarm Relay NC
NOTE
All building alarm inputs require an isolated normally−open or normally−closed contact or switch (rated at 24 Vdc, 20 mA minimum)
connected between the alarm input and common terminal as shown. Building alarm inputs can be programmed for use with either
normally−open or normally−closed contacts. All control wiring and relay and switch contacts are customer-supplied.
NOTE
The building alarms can be programmed to display the alarm functional name using the front panel LCD controls.
Figure A-38. PDU Interface Terminal Detail