INSTALLATION REFERENCE
EATON
Powerware
®
225 kVA PDU Installation and Operation Manual
S
164201629 Rev D
www.powerware.com
A−49
AC Input to Main
Breaker CB1
Phase A
Phase B
Phase C
Figure A-35. Power Terminal Locations – PDU Input Main Breaker CB1 Terminal Detail
Left or Right Side Breaker
AC Output to
Critical Load
Phase A
Phase B
Phase C
Figure A-36. Power Terminal Locations – 225A F" Frame Output Subfeed Breaker Terminal Detail
Summary of Contents for Powerware 225 kVA Three-Phase Power Distribution...
Page 141: ......
Page 142: ...164201629D 164201629 D...