INSTALLATION
Eaton 9140 UPS (7.5–10 kVA) User's Guide
S
164201622 Rev 3
www.eaton.com/powerquality
24
Rack Setup for the EBM
NOTE
Mounting rails are required for each individual cabinet.
NOTE
The recommended configuration is to install the EBM(s) in the lower part of the rack,
with the UPS directly above the EBM(s).
To install the optional EBM rail kit:
1.
Select the proper holes in the rack for positioning the EBM in the
rack (see Figure 2).
NOTE
The EBM takes up position 1 through position 9.
Position 2
Position 5
Position 8
Screw Positions
for Rail and Front
Mounting Bracket
Position 4
Position 3
Bottom of Rack or
Top of Other Cabinet
Figure 2. Front Rail Screw Positions for the EBM
2.
If access to the sides of your rack is difficult, adjust the length of
the rails (see Figure 4) and loosely install the fasteners (see
Figure 6) before continuing to Step 3.