INSTALLATION
Eaton
®
9140 (9910-E82/E83) UPS Installation Guide for IBM
®
Applications
S
164201715 Rev 2
www.eaton.com/ibm
5
Unpacking the Cabinet
C
A
U
T
I
O
N
S
Unpacking the cabinet in a low-temperature environment may cause condensation to
occur in and on the cabinet. Do not install the cabinet until the inside and outside of the
cabinet is absolutely dry (hazard of electric shock).
S
The UPS is heavy (42 kg/92 lb). A minimum of two people are required to remove the
UPS from its carton.
To unpack the cabinet and accessories:
1.
Cut the pallet straps and remove the large cardboard outer sleeve.
Have two people lift the sleeve for ease of removal.
2.
The cabinet, batteries, and accessory kit are packaged in individual
cartons. Do not install the batteries until after the cabinet is installed
in the rack.
Use care when moving and opening the cartons. Leave the
components packaged until ready to install.
3.
Discard or recycle the packaging in a responsible manner, or store it
for future use.
Follow these guidelines when locating the cabinet after unpacking:
S
Place the cabinet in a protected area that has adequate airflow and is
free of humidity, flammable gas, and corrosion.
S
Avoid placing the cabinet on its side. Make sure the air vents on the
front and rear of the cabinet are not blocked.
S
The recommended configuration is to install the optional EBM(s) in
the lower part of the rack, with the UPS directly above the EBM(s).
If installing optional EBM(s), continue to the following section, “EBM
Setup.” Otherwise, continue to “UPS Setup” on page 15.