INSTALLATION
Eaton
®
9140 (9910-E82/E83) UPS Installation Guide for IBM
®
Applications
S
164201715 Rev 2
www.eaton.com/ibm
10
8.
Place the EBM on a flat, stable surface with the front of the EBM
facing toward you.
9.
If the front and rear mounting brackets are already installed, skip to
Step 12. If the brackets are not already installed, continue to
Step 10.
10.
Align the two front mounting brackets with the screw holes on the
sides of the EBM and secure with eight supplied M4 flat-head
screws (see Figure 6).
11.
Align the two rear mounting brackets with the lowest two screw
holes on the sides of the EBM and secure with four supplied M4
flat-head screws.
Front Mounting
Brackets (2)
Rear Mounting
Brackets (2)
Figure 6. Installing the EBM Front and Rear Mounting Brackets
12.
Install two cage or clip nuts as shown in Figure 7. If the rack holes
are square, use two cage nuts. If the rack holes are round, use two
clip nuts.
13.
Slide the EBM into the rack. Verify that the rear mounting brackets
engage in and slide easily along the inside of the rails.