5.
If installing the 3- or 6-slot cabinet in a rack, see ”Rack-Mount
Installation (Three- and Six-Slot Cabinets)” on page 14 to install the
cabinet in the rack.
6.
If you are installing an external battery cabinet, continue to “Battery
Cabinet Installation” on page 61.
If you do not have an external battery cabinet, continue to “UPS
Startup” on page 67 for plug-receptacle units. For hardwired units,
continue to “UPS with Bypass Electrical Installation” on page 19 or
“UPS Electrical Installation” on page 39.
Nine- and Twelve-Slot Cabinets
C A U T I O N
Do NOT lower the casters or attempt to move the cabinet with the power or battery modules
installed.
To set up 9- or 12-slot cabinets:
NOTE
If you are installing a 12-slot Powerware 9170
+
UPS with
non-isolated output
, do
not follow this procedure. Proceed to “Stabilizer Bracket Installation (Twelve-Slot Cabinet
Only)” on page 13.
1.
Lower the four cabinet casters (one at each corner of the cabinet
base) by using a 1/2
”
hex-style socket wrench to turn each bolt
clockwise.
2.
With all casters fully extended, carefully roll the cabinet down the
ramp to its intended operating location.
3.
Stabilize the cabinet in its operating location by turning the four
caster bolts counter-clockwise until the cabinet rests on the floor.
Place a plastic cap into each bolt access hole.
NOTE
If the floor is uneven and the cabinet is tilted or unstable, you may need to place a
thin steel plate under a corner.
Do not use the caster bolts to level the cabinet.
4.
If an optional floor anchor kit is included for extra stability, see
”Floor Anchor Kit Installation” on page 16 to install the floor anchor
brackets.