INSTALLATION SETUP
EATON
Powerware
®
9170
+
UPS (3–18 kVA) User’s Guide
S
164201393 Rev C
www.powerware.com
16
7.
Install one equipment rail on each side of the rack using four
10-32
×
1/2
”
flat-head screws per rail. Select the proper holes in the
rail that position the UPS at the desired location in the rack (see
Figure 11).
Equipment Rail
Figure 11. Rails Holding UPS
8.
With one person lifting each side of the UPS cabinet, position the
cabinet onto the two equipment rails.
Carefully slide the UPS into the equipment rack until the rack-mount
ears of the cabinet are flush with the front vertical rails of the rack.
Verify that the holes in the ears align with the holes in the rack.
9.
Secure the UPS in the rack using eight 10-32
×
1/2
”
Torx
®
screws
(16 for 6-slot cabinets) or other appropriate customer-specified
screws.
Floor Anchor Kit Installation
An optional floor anchor kit (ASY-0548) is available for all sizes of the
Powerware 9170
+
UPS. The kit helps to stabilize the UPS or battery
cabinet in the event of accidental bumps or small floor movements. Any
testing to specific seismic requirements is the responsibility of the
customer.
The floor anchor brackets, shipped separately from the UPS and battery
cabinet, should be attached inside the lower front and rear edges of the
cabinet before installing power and battery modules and before making
connections to the intended power source.