INSTALLATION SETUP
EATON
Powerware
®
9170
+
UPS (3–18 kVA) User’s Guide
S
164201393 Rev C
www.powerware.com
18
The 9- and 12-slot cabinets have casters built into the cabinet base. To
raise the cabinet before rolling it on its casters:
1.
Verify that the cabinet contains no power or battery modules.
2.
For 12-slot cabinets with non-isolated output only.
Slide the cabinet
base out from under the stabilizer brackets in the rear section of the
cabinet base.
Remove the stabilizer brackets from the floor/wall. Follow the
instructions in “Stabilizer Bracket Installation” on page 13 to
reinstall the stabilizer brackets in the new location.
3.
Locate the four plastic caps covering the caster bolts. They are at
the corners of the cabinet base.
4.
Pry the caps out of the bolt access holes.
5.
Use a 1/2
”
hex-style socket wrench to turn each of the four bolts
clockwise. Doing so lowers the casters to allow the cabinet to roll
on the casters.
6.
After rolling the cabinet to its intended position, turn all four caster
bolts counter-clockwise until the cabinet rests on the floor. Place a
plastic cap into each bolt access hole.
NOTE
If the floor is uneven and the cabinet is tilted or unstable, you may need to place a
thin steel plate under a corner.
Do not use the caster bolts to level the cabinet.
7.
After properly positioning and leveling the cabinet, insert power and
battery modules into the cabinet as described in “Power and
Battery Module Installation” on page 68.