Stabilizing the Cabinet
NOTE
For seismic installations, you MUST order and install an Eaton 9355 UPS UPS
seismic kit; do not use the following instructions.
NOTE
For non-seismic installations, you MUST install the stabilizing bracket on all 3-high
cabinets. The stabilizing bracket is optional for 2-high cabinets.
To stabilize the cabinet(s):
1.
Lower the leveling feet to prevent the cabinet from rolling.
Figure 40. Lowering the Leveling Feet
2.
Attach the stabilizing bracket to the bottom of the cabinet rear panel
using the retained hardware from the shipping pallet according to
the cabinet configuration:
S
For one cabinet, see Figure 41.
S
For two cabinets, see Figure 42.
S
For three cabinets, see Figure 43.
NOTE
No more than three cabinets can be attached together. For four cabinets, use two of
the two-cabinet installations. For five cabinets, use one three-cabinet and one two-cabinet
installation.
3.
Use the holes and slots in the bottom of the bracket to attach the
cabinet to the flooring if desired.
Summary of Contents for Powerware 9355
Page 1: ...Powerware Series Eaton 9355 UPS 10 15 kVA User s Guide...
Page 2: ......
Page 3: ...Powerware Series Eaton 9355 UPS 10 15 kVA User s Guide...
Page 119: ......
Page 120: ...164201594D 164201594 D...