INSTALLING OPTIONS
Eaton 9355 Tie Cabinet (20/30 kVA) Installation Guide
S
164201630 Rev D
www.eaton.com/powerquality
23
10.
Route the pull-chain wiring through the middle of the fan section and secure in
the cable clips for each UPS (see Figure 17).
Figure 17. Installing Communication Cables