Using the Control Panel
9-46
EATON
Powerware
®
9390 UPS (100–160 kVA) Installation and Operation Manual
S
164201554 Rev E
powerware.com
SYSTEM CONTROLS
LOAD OFF
PM OFF
CHGR ON
MAINTENANCE BYPASS
BYPASS
POWER MODULE (PM)
OFF
:
OFF
:
ONLINE
:
CHARGER
OFF
:
Figure 9-52. System Controls Screen 2
The CHGR pushbutton switch toggles the charger function On and Off. The PM pushbutton
switch toggles the power module function On and Off.
For detailed information about using the System Controls, see Chapter 10, “UPS Operating
Instructions.”
Summary of Contents for Powerware 9390-160/100
Page 1: ...Powerware 9390 UPS 100 160 kVA Installation and Operation Manual...
Page 225: ......
Page 226: ...164201554E 164201554 E...