POWER WIRING INSTALLATION NOTES
C
164201554---5
081505
7 of 15
DESCRIPTION:
DATE:
DRAWING NO:
SHEET:
REVISION:
Installation Information
A-18
EATON
Powerware
®
9390 UPS (100–160 kVA) Installation and Operation Manual
S
164201554 Rev E
powerware.com
Table J. Power Cable Conduit Requirements (Cont’d)
UPS Model
Voltage
Terminal
Number of
Wires in
Conduit
Minimum Conduit
Trade Size (inches)
Number of
Conduits
Powerware
9390---160/160
208/220
AC
AC Input to UPS
(A, B, C, Gnd)
4
3-1/2
2
AC Input to Bypass
(A, B, C, Neut, Gnd)
5
3-1/2
2
Output
(A, B, C, Neut, Gnd)
5
3-1/2
2
DC
Battery
(Positive), (Negative), Gnd
5
2-1/2
1
Powerware
9390---160/160
480
AC
AC Input to UPS
(A, B, C, Gnd)
4
2
2
AC Input to Bypass
(A, B, C, Neut, Gnd)
5
2
2
Output
(A, B, C, Neut, Gnd)
5
2
2
DC
Battery
(Positive), (Negative), Gnd
5
2-1/2
1
Summary of Contents for Powerware 9390-160/100
Page 1: ...Powerware 9390 UPS 100 160 kVA Installation and Operation Manual...
Page 225: ......
Page 226: ...164201554E 164201554 E...