Testing New Batteries
NOTE
The batteries must be fully charged and the UPS must not be in Battery mode to
perform the battery test.
NOTE
For an accurate battery test, test the UPS with at least 10% load applied to the UPS.
To test new batteries:
1.
Plug the UPS into a power outlet for 48 hours to charge the battery.
2.
Press any button to activate the menu options.
3.
Select CONTROL then START BATTERY TEST.
During the battery test, the front panel displays “Battery Test
Pending.”
A failed battery test initiates a Battery Test Failed alarm.
To cancel a battery test in progress:
1.
Press any button to activate the menu options.
2.
Select CONTROL, START BATTERY TEST, then CANCEL.