INSTALLATION
EATON
Powerware
®
BladeUPS
®
(12 kVA) User's Guide
S
164201649 Rev 3
www.powerware.com
34
UPS Setup
The BladeUPS UPS comes with all hardware required for installation in a
standard EIA or JIS seismic rack-mount configuration with square and
round mounting holes. The rail assemblies adjust to mount in 48-cm
(19-inch) racks with front to rear rail distances from 61 to 76 cm (24 to
30 inches) deep.
Checking the UPS Accessories
Verify that the following items are included with the UPS:
S
UPS front cover
S
Rear panel terminal block connectors:
-
(4) two-position connectors
-
(2) two-position connectors with jumpers
-
(1) three-position connector
S
Software Suite CD
S
This user's guide
S
Mounting brackets and fasteners (if not already installed):
-
(2) mounting brackets
-
(8) 6-32 flat-head screws
S
Rails and fasteners:
-
(2) sliding rail assemblies (left and right)
-
(2) rear hold-down brackets
-
(16) M5 machine screws
-
(8) M5 clip nuts for racks with round holes
-
(8) M5 cage nuts for racks with square holes
-
(8) M6 hex nuts with integrated washers
Parallel system only.
Verify that the following items are included with
each Powerware Hot Sync CAN Bridge Card:
S
CAN Bridge Card cable with (2) RJ-45 connectors
S
Redundant signal cable with (2) two-position terminal block
connectors
S
Initializing jumper with single RJ-45 connector