INSTALLATION
EATON
Powerware
®
BladeUPS
®
(12 kVA) User's Guide
S
164201649 Rev 3
www.powerware.com
43
4.
Reinstall the battery cover plate.
5.
Install the UPS front cover (see Figure 28):
Plug the LCD cable from the control panel on the front cover into
the connector on the electronics module. Use care to gently loop
the LCD cable in front of the electronics module.
Push the top of the front cover firmly into place, and then push the
bottom firmly into place.
LCD Cable
Figure 28. Installing the UPS Front Cover
6.
Parallel system only.
Repeat the steps starting at the beginning of
this chapter (page 19) for each UPS to be paralleled.
7.
If you are installing an optional EBM, continue to the following
section, “EBM Installation.” Otherwise, continue to “Standalone
UPS Installation” on page 48 or “Parallel UPS Installation” on
page 50.