INSTALLATION
EATON
Powerware
®
BladeUPS
®
(12 kVA) User's Guide
S
164201649 Rev 3
www.powerware.com
59
11.
If you left the UPS unattached to the rack, secure the front and rear
of the UPS as described in Steps 14 and 15 on page 40.
12.
If your rack has conductors for grounding or bonding of ungrounded
metal parts, connect the ground cable (not included) to the ground
bonding screw. See Figure 32 on page 49 for the location of the
ground bonding screw.
13.
You can install an optional REPO circuit that will shut down the
entire parallel-ready system using a single switch. See “Remote
Emergency Power-off” on page 95 to install the REPO switch
before powering on the parallel-ready system.
14.
Connect the parallel input cord from the UPS to the BladeUPS Bar
in the rack as shown in Figure 37 on page 55.
Gently loop and twist the parallel input cord as shown to minimize
stress on the cord. The loop and twist for the cord may vary
depending on configuration and strain relief.
15.
Continue to “Parallel System Initial Startup” on page 68.