INSTALLATION
EATON
Powerware
®
BladeUPS
®
(12 kVA) User's Guide
S
164201649 Rev 3
www.powerware.com
65
19.
Connect the parallel input cord from each paralleled UPS to the
BladeUPS Bar in the rack as shown in Figure 44.
Gently loop and twist the parallel input cords as shown to minimize
stress on the cords. The loop and twist for each cord may vary
depending on configuration and strain relief.
20.
Continue to “Parallel System Initial Startup” on page 68. If you
installed the additional UPS(s) without shutting down the parallel
system, perform the steps in “Parallel System Initial Startup”on the
additional UPS(s) only.
Figure 44. Connecting UPSs to the BladeUPS Bar (Bottom Entry Shown)