Figure 17.
Verify Configuration Settings
Figure 18.
Verify Configuration Settings
Figure 19.
Verify Configuration Settings
Figure 20.
Clear Communication Message
Eaton
®
ConnectUPS
t
Web/SNMP Card (X and BD Models) Quick Start Instructions 164950185 Rev B
www.eaton.com/powerquality
9
10.
Select your preferred method of shutting down your system
(see Figure 17). The default selection is recommended.
Select
Next
.
11.
The Event and Logging Options dialog opens (see Figure 18).
Select
Next
.
12.
Verify the configuration settings are correct and select
Finish
13.
A pop-up message indicates that communication with the
card is established (see Figure 20). Select
Clear
to
acknowledge the message.
14.
Repeat Steps 1 through 13 on all computers powered by the
corresponding UPS using this specific card.
NetWatch installation and configuration is now complete.