Chapter 3
Installation
This chapter explains:
S
Equipment inspection
S
Required tools
S
Unpacking the cabinet
S
Parallel system setup
S
Extended Battery Module (EBM) setup and installation (optional)
S
UPS setup and installation, including UPS internal batteries
S
Parallel installation (optional)
S
Initial startup
Inspecting the Equipment
If any equipment has been damaged during shipment, keep the shipping cartons and
packing materials for the carrier or place of purchase, and file a claim for shipping
damage. If you discover damage after acceptance, file a claim for concealed damage.
To file a claim for shipping damage or concealed damage: 1) File with the carrier
within 15 days of receipt of the equipment; 2) Send a copy of the damage claim
within 15 days to your service representative.
NOTE
Check the battery recharge date on the shipping carton label. If the date has expired and the
batteries were never recharged, do not use the UPS. Contact your service representative.
Tools Required
To assemble the components, you may need the following tools:
S
Medium flat-bladed screwdriver
S
Short-handled #2 Phillips
®
screwdriver
S
Long-handled #2 Phillips screwdriver
S
7 and 8 mm wrench or socket
Summary of Contents for Powerware Series
Page 1: ...Powerware Series Eaton BladeUPS 12 kVA User s Guide ...
Page 2: ......
Page 3: ...Powerware Series Eaton BladeUPS 12 kVA User s Guide ...
Page 84: ...OPERATION EATON BladeUPS 12 kVA User s Guide S 164201649 Rev 4www eaton com powerquality 76 ...
Page 119: ......
Page 120: ... 1642016494 164201649 4 ...