INSTALLATION
EATON
BladeUPS
®
(12 kVA) User's Guide
S
164201649 Rev 4
www.eaton.com/powerquality
32
2.
Pre-assemble four M6 hex nuts to the rail assembly:
Assemble two of the nuts and the rear hold-down bracket and finger-tighten only.
Assemble the other two nuts to the rail and finger-tighten only. See Figure 18.
Repeat for the other rail.
M6 Hex
Nuts
Front
Rear
Rear Hold-Down
Bracket
Figure 18. Installing the Rail Hardware (Right Rail Assembly Shown)
NOTE
Verify that the holes in the rail align properly with the hole pattern in the rack. If the rack has square
holes, verify that the studs on the end of the rail align within the square holes.
3.
Using two M5 machine screws, attach the rail to the front of the rack and
finger-tighten only (see Figure 17 and Figure 19).
Position 1
Front M5 Screws
Position 12
Rail Stud
(2 places)
Position 2
Position 11
Figure 19. Securing the Front Rail
4.
Adjust the rail size on the rail assembly for the depth of your rack.
Summary of Contents for Powerware Series
Page 1: ...Powerware Series Eaton BladeUPS 12 kVA User s Guide ...
Page 2: ......
Page 3: ...Powerware Series Eaton BladeUPS 12 kVA User s Guide ...
Page 84: ...OPERATION EATON BladeUPS 12 kVA User s Guide S 164201649 Rev 4www eaton com powerquality 76 ...
Page 119: ......
Page 120: ... 1642016494 164201649 4 ...