INSTALLATION
EATON
BladeUPS
®
(12 kVA) User's Guide
S
164201649 Rev 4
www.eaton.com/powerquality
45
6.
Loosely install the Powerware Hot Sync CAN Bridge Card into the open X-Slot
communication bay on the UPS rear panel.
7.
Repeat Steps 4 through 6 to install a CAN Bridge Card in each UPS to be
paralleled.
NOTE
The BladeUPS parallel system can automatically assign identities to each UPS in the system based
on the order in which their CAN Bridge Cards are wired in Steps 8 through 11. For more information, see
“Auto-Identification” on page 87.
8.
Install one of the two supplied blue terminating plugs (see Figure 34) into the
CAN IN port on the first UPS (UPS 1 in Figure 36).
SHIE
LD
CAN
H
CAN
L
TX
TX
NO
CO
M
NC
AL
R
R
TN
AL
AR
M
CAN
O
U
T
CAN
I
N
Blue Terminating Plug (CAN IN)
Figure 34. Installing the Blue Terminating Plug (First UPS)
Summary of Contents for Powerware Series
Page 1: ...Powerware Series Eaton BladeUPS 12 kVA User s Guide ...
Page 2: ......
Page 3: ...Powerware Series Eaton BladeUPS 12 kVA User s Guide ...
Page 84: ...OPERATION EATON BladeUPS 12 kVA User s Guide S 164201649 Rev 4www eaton com powerquality 76 ...
Page 119: ......
Page 120: ... 1642016494 164201649 4 ...